Closed System Water Sampling
Corrosion, Inhibitor & Bacteria Testing

Laboratory analysis of LTHW, chilled water and process loops to prove the water is still protecting the plant — inhibitor strength, corrosion metals, pH, conductivity and bacterial counts in one report.

What the service covers

Closed systems fail quietly. A heating circuit that has lost its inhibitor will corrode from the inside, the sludge that forms then blocks terminal units, reduces efficiency and eventually takes radiators, coils and boilers out of service. Chilled water systems that develop bacterial contamination can foul heat exchangers and generate odour and corrosion by-products at the same time.

Sampling is the only way to see inside the water without dismantling the plant. We take samples from representative points — typically the low-level drain, the pump suction and any bypass sample cock — record system pressure and condition, and submit the samples for analysis against the parameters relevant to the system, using BSRIA guidance as the reference framework.

Reports are written for building services engineers and facilities managers, not chemists: current value, target range, trend, and what to do about it. Where a system is simply depleted we recommend corrective dosing; where the water carries significant sediment or bacterial load, we recommend a dynamic flush or pre-commission clean and will scope that work with you.

Our process, step by step

01Review of system type, volume, materials and existing water treatment regime
02Agreement of sample points and parameter suite
03Attendance and sampling at drain, pump suction and any sample cock
04On-site measurements: pH, conductivity and inhibitor where practicable
05Laboratory analysis of corrosion metals, solids and bacteria
06Reporting by parameter with target range and pass or fail assessment
07Corrective dosing recommendation or flush and clean scope
08Follow-up sampling to verify the correction has worked

Frequently asked questions

What is a closed system and why sample it?

A closed system is heating, chilled or process water that recirculates without deliberate loss — LTHW heating circuits, chilled water, and some process loops. Because the water is not replaced, corrosion and bacterial problems concentrate. Sampling tells you whether the inhibitor is still at the correct strength, whether corrosion is occurring, and whether bacterial contamination has taken hold.

What parameters are tested?

Typical closed system suites include pH, conductivity, inhibitor concentration where an inhibitor is used, iron, copper, turbidity, suspended solids, total viable counts and, where specified, sulphate-reducing and nitrite-reducing bacteria. Glycol strength is tested where freeze protection is required.

How often should closed systems be sampled?

BSRIA guidance and good practice generally recommend sampling at commissioning after pre-commission cleaning, then at least annually, with more frequent testing in the first year of a new system or where corrosion or bacterial results have been unsatisfactory.

Can you dose the system back to specification?

Yes. Where results show inhibitor depletion or a corrosion trend we can recommend and supply corrective dosing. Where results show significant sediment or bacterial contamination we will recommend a dynamic flush and, if necessary, pre-commission cleaning rather than simply topping up chemicals.