First, read the number, not the word
HSG274 Part 2 sets interpretation thresholds for routine sampling of hot and cold water systems: 100 colony forming units per litre is an alert level, and 1000 cfu/l is an action level. A single low-level result on one sample point tells a different story to a result at action level, and a cluster across several points tells a different story again.
Your response should be proportionate to the concentration, the sample point involved, the population using the building, and whether this is a first occurrence or part of a pattern. The written scheme of control should already say what happens at each level.
The first 24 to 48 hours
Record the result and notify the responsible person. Review the system condition against the site risk assessment — temperatures, tank condition, dead legs, recent works, occupancy changes. Where a shower or outlet is implicated, take it out of use and label it. Resample to confirm, and sample adjacent outlets to establish the extent rather than assuming it is isolated.
- Do not drain or dose the system before resampling unless there is an immediate safety concern
- Restrict access to implicated outlets, showers or spray taps
- Identify and address any obvious cause — failed TMV, calorifier below 60°C, tank above 20°C, dead leg
- Resample the affected point and its neighbours; consider swabs if problems recur
Remediation
Where the tank is the source, cleaning and disinfection to HSG274 Part 2 is the usual remedy. Where the problem is distribution, whole-system disinfection may be needed. Where a calorifier is at fault, the answer is temperature correction rather than chemicals. Where a dead leg or redundant pipework is implicated, the most reliable fix is removing it.
Cleaning and chlorination without addressing the underlying cause almost guarantees the problem returns. That is why we survey before quoting remediation, rather than dosing first and investigating afterwards.
Verification and closure
Remedial work is verified by resampling, with results retained alongside the risk assessment, the service report and the sequence of action taken. If the same point fails again after proper remediation, the investigation has to go further — biofilm swabs, a review of the system schematic, inspection of hidden pipework and consideration of whether the tank or calorifier needs replacing.
This article is general guidance, not a site-specific risk assessment. Control measures for your building should follow your written scheme of control and the Approved Code of Practice L8 with HSG274.